GATE 2021 ME Set 2 · Question 46

2 marksNumerical answerIndustrial EngineeringDeterministic Inventory Models

Daily production capacity of a bearing manufacturing company is bearings. The daily demand of the bearing is . The holding cost per year of keeping a bearing in the inventory is ₹ . The setup cost for the production of a batch is ₹ . Assuming working days in a year, the economic batch quantity in number of bearings is ________ (in integer).

GATE 2021 · Mechanical Engineering · Set 2 · IIT Bombay · printed as Q.36 in the ME section

Answer
40200 to 40300

From the official answer key published by IIT Bombay.

Worked solution

The Economic Batch Quantity () is given by:

Given data:

  • Daily demand,
  • Daily production capacity,
  • Number of working days in a year
  • Annual demand,
  • Setup cost,
  • Inventory holding cost per unit per year,

Substitute the values into the formula:

The integer value is 40249 (which falls within the official range of 40200 to 40300).

Answer: 40249

Practise Deterministic Inventory Models

16 GATE questions from this chapter, in short untimed sets, with the formula sheet beside them. Free.

More from Deterministic Inventory Models

Question from the official GATE 2021 ME paper (Set 2), IIT Bombay. Solutions by PARIXO AI. All 65 questions of this paper.