Industrial Engineering: GATE ME previous year questions
98 questions from the official GATE Mechanical Engineering papers, chapter by chapter, newest first, each with its answer and a worked solution.
Chapters
Forecasting Models15 questionsAggregate Planning, MRP and Lean Manufacturing5 questionsSequencing and Scheduling6 questionsDeterministic Inventory Models16 questionsStochastic Inventory & Safety Stock Systems3 questionsLinear Programming and Simplex Method14 questionsTransportation, Assignment and Network Flow8 questionsQueuing Theory11 questionsPERT and CPM20 questions
1. Forecasting Models
- GATE 2026 ME · Q60The actual demand for castings in a factory is 500 units and 635 units for the months of January 2026 and…
- GATE 2025 ME · Q37Considering the actual demand and the forecast for a product given in the table below, the mean forecast…
- GATE 2022 ME Set 2 · Q32An electric car manufacturer underestimated the January sales of car by 20 units, while the actual sales was…
- GATE 2021 ME Set 2 · Q53The demand and forecast of an item for five months are given in the table. | Month | Demand | Forecast | |…
- GATE 2020 ME Set 2 · Q43The forecast for the monthly demand of a product is given in the table below. | Month | Forecast | Actual…
- GATE 2019 ME Set 1 · Q27The table presents the demand of a product. By simple three-months moving average method, the…
- GATE 2018 ME Set 1 · Q26The time series forecasting method that gives equal weightage to each of the m most recent observations is
- GATE 2016 ME Set 3 · Q64The demand for a two-wheeler was 900 units and 1030 units in April 2015 and May 2015, respectively. The…
- GATE 2015 ME Set 1 · Q44For a canteen, the actual demand for disposable cups was 500 units in January and 600 units in February. The…
- GATE 2015 ME Set 2 · Q35Sales data of a product is given in the following table: | Month | January | February | March | April | May…
- GATE 2015 ME Set 2 · Q65A manufacturer has the following data regarding a product: Fixed cost per month = Rs. 50000 Variable cost…
- GATE 2014 ME Set 1 · Q29In exponential smoothening method, which one of the following is true?
- GATE 2014 ME Set 2 · Q29A component can be produced by any of the four processes I, II, III and IV. The fixed cost and the variable…
- GATE 2014 ME Set 3 · Q29The actual sales of a product in different months of a particular year are given below: | September |…
- GATE 2013 ME · Q14In simple exponential smoothing forecasting, to give higher weightage to recent demand information, the…
2. Aggregate Planning, MRP and Lean Manufacturing
- GATE 2022 ME Set 1 · Q59The product structure diagram shows the number of different components required at each level to produce one…
- GATE 2021 ME Set 2 · Q39A factory produces m (i = 1, 2, , m) products, each of which requires processing on n (j = 1, 2, , n)…
- GATE 2020 ME Set 1 · Q43For an assembly line, the production rate was 4 pieces per hour and the average processing time was 60…
- GATE 2020 ME Set 2 · Q23In Materials Requirement Planning, if the inventory holding cost is very high and the setup cost is zero,…
- GATE 2012 ME · Q13Which one of the following is NOT a decision taken during the aggregate production planning stage?
3. Sequencing and Scheduling
- GATE 2026 ME · Q47Four jobs are on order in a factory. As on day 20 of the production calendar, the corresponding due date and…
- GATE 2024 ME · Q34A set of jobs U, V, W, X, Y, Z arrive at time t = 0 to a production line consisting of two workstations in…
- GATE 2022 ME Set 2 · Q41Parts P1-P7 are machined first on a milling machine and then polished at a separate machine. Using the…
- GATE 2021 ME Set 1 · Q38A set of jobs A, B, C, D, E, F, G, H arrive at time t = 0 for processing on turning and grinding machines.…
- GATE 2018 ME Set 1 · Q62Processing times (including setup times) and due dates for six jobs waiting to be processed at a work centre…
- GATE 2017 ME Set 1 · Q52Following data refers to the jobs (P, Q, R, S) which have arrived at a machine for scheduling. The shortest…
4. Deterministic Inventory Models
- GATE 2026 ME · Q61The inventory holding cost of an item is ₹ 0.50 per unit per month and the ordering cost per order is ₹ 550.…
- GATE 2025 ME · Q64A company uses 3000 units of a part annually. The units are priced as given in the table below. It costs ₹…
- GATE 2024 ME · Q38A company orders gears in conditions identical to those considered in the economic order quantity (EOQ)…
- GATE 2023 ME · Q13With reference to the Economic Order Quantity (EOQ) model, which one of the options given is correct?
- GATE 2022 ME Set 1 · Q22Which one of the following is NOT a form of inventory?
- GATE 2021 ME Set 2 · Q46Daily production capacity of a bearing manufacturing company is 30000 bearings. The daily demand of the…
- GATE 2020 ME Set 1 · Q58Consider two cases as below. Case 1: A company buys 1000 pieces per year of a certain part from vendor 'X'.…
- GATE 2020 ME Set 2 · Q57For a single item inventory system, the demand is continuous, which is 10000 per year. The replenishment is…
- GATE 2019 ME Set 2 · Q65The annual demand of valves per year in a company is 10,000 units. The current order quantity is 400 valves…
- GATE 2018 ME Set 2 · Q28A local tyre distributor expects to sell approximately 9600 steel belted radial tyres next year. Annual…
- GATE 2016 ME Set 1 · Q64The annual demand for an item is 10,000 units. The unit cost is Rs. 100 and inventory carrying charges are…
- GATE 2016 ME Set 2 · Q64A food processing company uses 25,000 kg of corn flour every year. The quantity-discount price of corn flour…
- GATE 2015 ME Set 2 · Q34Annual demand of a product is 50000 units and the ordering cost is Rs. 7000 per order. Considering the basic…
- GATE 2015 ME Set 3 · Q43The annual requirement of rivets at a ship manufacturing company is 2000 kg. The rivets are supplied in…
- GATE 2014 ME Set 2 · Q61Consider the following data with reference to elementary deterministic economic order quantity model |…
- GATE 2014 ME Set 3 · Q61A manufacturer can produce 12000 bearings per day. The manufacturer received an order of 8000 bearings per…
5. Stochastic Inventory & Safety Stock Systems
- GATE 2022 ME Set 2 · Q33The demand of a certain part is 1000 parts/year and its cost is ₹ 1000/part. The orders are placed based on…
- GATE 2021 ME Set 1 · Q30Robot Ltd. wishes to maintain enough safety stock during the lead time period between starting a new…
- GATE 2014 ME Set 4 · Q29Demand during lead time with associated probabilities is shown below: | Demand | 50 | 70 | 75 | 80 | 85 | |…
6. Linear Programming and Simplex Method
- GATE 2026 ME · Q46An objective function Z of primal variables (x1 and x2) is described below: Minimize Z = 0.07 x1 + 0.05 x2…
- GATE 2024 ME · Q39At the current basic feasible solution (bfs) v0 ( v0 R5), the simplex method yields the following form of a…
- GATE 2023 ME · Q14Which one of the options given represents the feasible region of the linear programming model: Maximize 45X1…
- GATE 2022 ME Set 1 · Q21In a linear programming problem, if a resource is not fully utilized, the shadow price of that resource is
- GATE 2022 ME Set 2 · Q42A manufacturing unit produces two products P1 and P2. For each piece of P1 and P2, the table below provides…
- GATE 2020 ME Set 1 · Q57Two business owners Shveta and Ashok run their businesses in two different states. Each of them, independent…
- GATE 2018 ME Set 2 · Q45The problem of maximizing z = x1 - x2 subject to constraints x1 + x2 ≤ 10, x1 ≥ 0, x2 ≥ 0 and x2 ≤ 5 has
- GATE 2017 ME Set 1 · Q51Two models, P and Q, of a product earn profits of Rs. 100 and Rs. 80 per piece, respectively. Production…
- GATE 2017 ME Set 2 · Q51Maximize Z = 5x1 + 3x2, subject to x1 + 2x2 ≤ 10, x1 - x2 ≤ 8, x1, x2 ≥ 0. In the starting Simplex tableau,…
- GATE 2016 ME Set 1 · Q65Maximize Z = 15X1 + 20X2 subject to 12X1 + 4X2 ≥ 36 12X1 - 6X2 ≤ 24 X1, X2 ≥ 0 The above linear programming…
- GATE 2016 ME Set 3 · Q65A firm uses a turning center, a milling center and a grinding machine to produce two parts. The table below…
- GATE 2015 ME Set 3 · Q61For the linear programming problem: arrayll Maximize Z = 3X1 + 2X2 Subject to -2X1 + 3X2 ≤ 9 X1 - 5X2 ≥ -20…
- GATE 2014 ME Set 3 · Q49Consider an objective function Z(x1, x2) = 3x1 + 9x2 and the constraints x1 + x2 ≤ 8, x1 + 2x2 ≤ 4, x1 ≥ 0,…
- GATE 2013 ME · Q36A linear programming problem is shown below. aligned Maximize 3x + 7y Subject to 3x + 7y ≤ 10 4x + 6y ≤ 8 x,…
7. Transportation, Assignment and Network Flow
- GATE 2024 ME · Q65In a supplier-retailer supply chain, the demand of each retailer, the capacity of each supplier, and the…
- GATE 2022 ME Set 1 · Q58An assignment problem is solved to minimize the total processing time of four jobs (1, 2, 3 and 4) on four…
- GATE 2019 ME Set 1 · Q64Five jobs (J1, J2, J3, J4 and J5) need to be processed in a factory. Each job can be assigned to any of the…
- GATE 2018 ME Set 2 · Q61The arc lengths of a directed graph of a project are as shown in the figure. The shortest path length from…
- GATE 2017 ME Set 2 · Q48A product made in two factories, P and Q, is transported to two destinations, R and S. The per unit costs of…
- GATE 2014 ME Set 2 · Q28If there are m sources and n destinations in a transportation matrix, the total number of basic variables in…
- GATE 2014 ME Set 3 · Q31A minimal spanning tree in network flow models involves
- GATE 2014 ME Set 4 · Q28The total number of decision variables in the objective function of an assignment problem of size n × n (n…
8. Queuing Theory
- GATE 2024 ME · Q35A queueing system has one single server workstation that admits an infinitely long queue. The rate of…
- GATE 2021 ME Set 1 · Q43Customers arrive at a shop according to the Poisson distribution with a mean of 10 customers/hour. The…
- GATE 2021 ME Set 1 · Q52Consider a single machine workstation to which jobs arrive according to a Poisson distribution with a mean…
- GATE 2018 ME Set 2 · Q34The arrival of customers over fixed time intervals in a bank follow a Poisson distribution with an average…
- GATE 2017 ME Set 2 · Q23For a single server with Poisson arrival and exponential service time, the arrival rate is 12 per hour.…
- GATE 2016 ME Set 2 · Q30In a single-channel queuing model, the customer arrival rate is 12 per hour and the serving rate is 24 per…
- GATE 2015 ME Set 3 · Q18In the notation (a/b/c) : (d/e/f) for summarizing the characteristics of queueing situation, the letters 'b'…
- GATE 2014 ME Set 1 · Q28The jobs arrive at a facility, for service, in a random manner. The probability distribution of number of…
- GATE 2014 ME Set 1 · Q60Jobs arrive at a facility at an average rate of 5 in an 8 hour shift. The arrival of the jobs follows…
- GATE 2014 ME Set 4 · Q61At a work station, 5 jobs arrive every minute. The mean time spent on each job in the work station is 1/8…
- GATE 2013 ME · Q13Customers arrive at a ticket counter at a rate of 50 per hr and tickets are issued in the order of their…
9. PERT and CPM
- GATE 2026 ME · Q65The activities of a PERT network and their corresponding activity time estimates (in weeks) i.e., optimistic…
- GATE 2025 ME · Q65A project involves eight activities with the precedence relationship and duration as shown in the table…
- GATE 2022 ME Set 1 · Q42Activities A to K are required to complete a project. The time estimates and the immediate predecessors of…
- GATE 2022 ME Set 2 · Q59A project consists of five activities (A, B, C, D and E). The duration of each activity follows beta…
- GATE 2021 ME Set 1 · Q45Activities A, B, C and D form the critical path for a project with a PERT network. The means and variances…
- GATE 2021 ME Set 2 · Q18A PERT network has 9 activities on its critical path. The standard deviation of each activity on the…
- GATE 2020 ME Set 1 · Q23In the Critical Path Method (CPM), the cost-time slope of an activity is given by
- GATE 2020 ME Set 2 · Q33Consider the following network of activities, with each activity named A–L, illustrated in the nodes of the…
- GATE 2019 ME Set 1 · Q65A project consists of six activities. The immediate predecessor of each activity and the estimated duration…
- GATE 2019 ME Set 2 · Q45The activities of a project, their duration and the precedence relationships are given in the table. For…
- GATE 2017 ME Set 2 · Q49A project starts with activity A and ends with activity F. The precedence relation and durations of the…
- GATE 2016 ME Set 2 · Q65A project consists of 14 activities, A to N. The duration of these activities (in days) are shown in…
- GATE 2016 ME Set 3 · Q35In PERT chart, the activity time distribution is
- GATE 2015 ME Set 1 · Q43Following data refers to the activities of a project, where, node 1 refers to the start and node 5 refers to…
- GATE 2015 ME Set 2 · Q64A project consists of 7 activities. The network along with the time durations (in days) for various…
- GATE 2014 ME Set 2 · Q60A project has four activities P, Q, R and S as shown below. | Activity | Normal duration (days) |…
- GATE 2014 ME Set 3 · Q60Consider the given project network, where numbers along various activities represent the normal time. The…
- GATE 2014 ME Set 4 · Q60The precedence relations and duration (in days) of activities of a project network are given in the table.…
- GATE 2012 ME · Q54Statement for Linked Answer Questions 54 and 55: For a particular project, eight activities are to be…
- GATE 2012 ME · Q55Statement for Linked Answer Questions 54 and 55: For a particular project, eight activities are to be…