With reference to the Economic Order Quantity (EOQ) model, which one of the options given is correct?

Figure 1 for GATE 2023 ME question 13
  1. A

    Curve P1: Total cost, Curve P2: Holding cost, Curve P3: Setup cost, and Curve P4: Production cost.

  2. B

    Curve P1: Holding cost, Curve P2: Setup cost, Curve P3: Production cost, and Curve P4: Total cost.

  3. C

    Curve P1: Production cost, Curve P2: Holding cost, Curve P3: Total cost, and Curve P4: Setup cost.

  4. D

    Curve P1: Total cost, Curve P2: Production cost, Curve P3: Holding cost, and Curve P4: Setup cost.

GATE 2023 · Mechanical Engineering · IIT Kanpur

Answer
(A)

From the official answer key published by IIT Kanpur.

Worked solution

In the classical Economic Order Quantity (EOQ) model, the costs associated with inventory as a function of order quantity are given by:

1. Holding cost per unit time: , which is directly proportional to , representing a straight line with a positive slope passing through the origin (Curve P2).
2. Setup (or Ordering) cost per unit time: , which is inversely proportional to , forming a rectangular hyperbola decreasing with (Curve P3).
3. Production (or Purchase) cost per unit time: , which is constant and independent of the batch order quantity, represented by a horizontal line (Curve P4).
4. Total cost: , which is the sum of all individual costs and forms a convex U-shaped curve with a unique minimum at (Curve P1).

Hence, Curve P1 is Total cost, Curve P2 is Holding cost, Curve P3 is Setup cost, and Curve P4 is Production cost.

Answer: (A)

Practise Deterministic Inventory Models

16 GATE questions from this chapter, in short untimed sets, with the formula sheet beside them. Free.

More from Deterministic Inventory Models

Question from the official GATE 2023 ME paper, IIT Kanpur. Solutions by PARIXO AI. All 65 questions of this paper.