GATE 2014 ME Set 3 · Question 61
A manufacturer can produce bearings per day. The manufacturer received an order of bearings per day from a customer. The cost of holding a bearing in stock is Rs. per month. Setup cost per production run is Rs. . Assuming working days in a year, the frequency of production run should be
- A
- B
- C
- D
GATE 2014 · Mechanical Engineering · Set 3 · IIT Kharagpur · printed as Q.51 in the ME section
Answer
From the official answer key published by IIT Kharagpur.
Worked solution
The Economic Production Quantity ( or ) is given by:
where:
- Production rate
- Demand rate
- Setup cost
- Working days per year
- Annual demand
- Holding cost per unit per year
Substitute these values:
The frequency of production runs (cycle time between successive setups) is:
Answer: (C)
Practise Deterministic Inventory Models
16 GATE questions from this chapter, in short untimed sets, with the formula sheet beside them. Free.
More from Deterministic Inventory Models
- GATE 2026 ME · Q61The inventory holding cost of an item is ₹ 0.50 per unit per month and the ordering cost per order is ₹ 550.…
- GATE 2025 ME · Q64A company uses 3000 units of a part annually. The units are priced as given in the table below. It costs ₹…
- GATE 2024 ME · Q38A company orders gears in conditions identical to those considered in the economic order quantity (EOQ)…
- GATE 2023 ME · Q13With reference to the Economic Order Quantity (EOQ) model, which one of the options given is correct?
- GATE 2022 ME Set 1 · Q22Which one of the following is NOT a form of inventory?
- GATE 2021 ME Set 2 · Q46Daily production capacity of a bearing manufacturing company is 30000 bearings. The daily demand of the…
Question from the official GATE 2014 ME paper (Set 3), IIT Kharagpur. Solutions by PARIXO AI. All 65 questions of this paper.