GATE 2015 ME Set 3 · Question 43
The annual requirement of rivets at a ship manufacturing company is . The rivets are supplied in units of costing Rs. each. If it costs Rs. to place an order and the annual cost of carrying one unit is of its purchase cost, the cycle length of the order (in days) will be ______
GATE 2015 · Mechanical Engineering · Set 3 · IIT Kanpur
Answer
From the official answer key published by IIT Kanpur.
Worked solution
The Economic Order Quantity (EOQ) is given by:
Given data:
- Annual demand (or )
- Unit purchase cost
- Ordering cost
- Holding cost rate
- Annual holding cost per unit
Calculating EOQ:
Assuming a year has days, the order cycle length is:
Answer: 77
Practise Deterministic Inventory Models
16 GATE questions from this chapter, in short untimed sets, with the formula sheet beside them. Free.
More from Deterministic Inventory Models
- GATE 2014 ME Set 2 · Q61Consider the following data with reference to elementary deterministic economic order quantity model |…
- GATE 2014 ME Set 3 · Q61A manufacturer can produce 12000 bearings per day. The manufacturer received an order of 8000 bearings per…
- GATE 2026 ME · Q61The inventory holding cost of an item is ₹ 0.50 per unit per month and the ordering cost per order is ₹ 550.…
- GATE 2025 ME · Q64A company uses 3000 units of a part annually. The units are priced as given in the table below. It costs ₹…
- GATE 2024 ME · Q38A company orders gears in conditions identical to those considered in the economic order quantity (EOQ)…
- GATE 2023 ME · Q13With reference to the Economic Order Quantity (EOQ) model, which one of the options given is correct?
Question from the official GATE 2015 ME paper (Set 3), IIT Kanpur. Solutions by PARIXO AI. All 65 questions of this paper.