A welding operation is being performed with voltage and current . The cross-sectional area of the weld bead is . The work-piece and filler are of titanium for which the specific energy of melting is . Assuming a thermal efficiency of the welding process , the welding speed (in mm/s) is ________ (correct to two decimal places).

GATE 2018 · Mechanical Engineering · Set 2 · IIT Guwahati · printed as Q.53 in the ME section

Answer
7.49 to 7.51

From the official answer key published by IIT Guwahati.

Worked solution

The electrical power supplied during the welding process is:

With a thermal efficiency , the effective heat rate available for melting is:

The heat required to melt the metal per unit time is related to the welding speed (in ) by:

where is the specific energy of melting and is the bead cross-sectional area.

Substituting the given values:

Answer: 7.50

Practise Welding I: Physics, Power Sources and Arc Welding

18 GATE questions from this chapter, in short untimed sets, with the formula sheet beside them. Free.

More from Welding I: Physics, Power Sources and Arc Welding

Question from the official GATE 2018 ME paper (Set 2), IIT Guwahati. Solutions by PARIXO AI. All 65 questions of this paper.